|
"SAIPEM 7000" |
|
|
|
Foto: www.tugspotters.com |
|
|
| Foto: www.tugspotters.com |
![]() |
|
Foto: www.tugspotters.com |
![]() |
|
Classification: Lloyds Register and R.I.Na. Compliance: NMD, HSE, USCG Rules Dimensions: Length: 198 m Breadth: 87 m Depth to main deck: 45 m Transit draft: 10.5 m Operational draft: 27.5 m Dynamic positioning: DP (AAA) Lloyds Register; IPD 3 R.I.Na.; Class 3 Norwegian Maritime Directorate notations; fully redundant. Mooring system: 14 x 1,350 kW single drum winches, each 3,350 m x 3¾" mooring line and 40 t anchors. Propulsion and thrusters: 4 x 4,500 kW propulsion azimuthing units, fixed pitch 2 x 5,500 kW retractable azimuthing units, fixed pitch 4 x 3,000 kW retractable azimuthing units, fixed pitch 2 x 2,500 kW bow tunnel units, fixed pitch Power plant: Total power plant 70,000 kW, 10,000 Volt; 12 diesel generators on heavy fuels divided in 4 fire segregated engine rooms; classified UMS Ballast system: Computer controlled system with simulation capabilities comprising 4 x 6,000 t/h ballast pumps, fully redundant. Lifting facilities main crane: 2 twin S 7000 model fully revolving bow mounted Amhoist cranes. Main blocks tandem lift: 14,000 t Main block single lift: 7,000 t revolving at 40 m rad./41 m tieback 6,000 t revolving at 45 m rad./50 m tieback Aux.1 block: 2,500 t revolving at 74 m rad. Aux. 2 block: 900 t revolving at 115 m rad. Lowering capability to 450 m below sea level Whip hook: 120 t revolving at 150 m rad. Pile driving/handling equipment availability: 2 Menck MHU 3000 hydraulic hammers. 2 Menck MHU 1700 hydraulic hammers. 2 Menck MHU 1000 hydraulic hammers. 2 Menck MHU 600 hydraulic hammers. 1 Menck MHU 220 hydraulic hammer. 1 Menck MHU 195 hydraulic hammer. 2 underwater power packs. 1 hydraulic hammer compensator. Slim and free riding mode capability. Full spread of internal/external elevators ranging from 20" to 102" i./o. dia. 2 levelling system range 66" - 72" dia. - 900 t capacity. J-Lay system: Pipe diameter range from 4" to 32" Main laying tension system 525 t with tensioners, up to 2,000 t with friction clamps; Laying tower angle 90º - 110º Abandonment/Recovery system double capstan winch with 550 t capacity (up to 2,000 t with clamps) Number of welding stations: 1 Number of NDT and field joint stations: 1 Pipe string quadruple joint Pipe storage capacity up to 6,000 t Crew facilities: 405 fully AC single or double cabins up to 800 persons. Helideck: Suitable for two BV234 LR Chinook helicopters (one parked). Classified helicopter refueling system. EPIC Offshore Onshore Drilling Press Releases Investor relations Blue Stream Glossary Qualification Management Last update: Friday, October 27, 2006 - 12:28:06 PM A subsidiary of Eni S.p.A. - Taxpayer’s code and VAT number 00825790157 - disclaimer |